Project Name: 2012 Sidewalk Program
Contractor: America’s Decorative Concrete – Section A
A-1 Concrete Leveling Company – Section B
Multi-Task Construction Co. – Section C
Project Description: Sidewalks are to be repaired that are in poor condition. Section A is replacement of concrete, sidewalks and aprons; Section B is sidewalk blocks raised; and Section C is the concrete portion of the street program.
Project Name: 2012 Street Improvement Program
Contractor: Barrett Paving Materials, Inc. – Section A
American Pavement, Inc. – Section B
Pavement Technology. – Section C
Project Description: Streets have been identified to be repaired that are in poor condition. Section A is Street Improvements; Section B is sealing; and Section C is reclamite surfacing.
Project Name: Chambersburg Sanitary Sewer Replacement
Contractor: Durst Brothers Excavating
Project Description: Chambersburg Sanitary Sewer Replacement
Project Name: Fire Hydrant Program
Contractor: Kinnison Excavating
Project Description: Replacement of old Fire Hydrants with new, updated Fire Hydrants
Project Name: Digital Data Conversion Services Utility Infrastructure, Phase III
Contractor: ARS Group
Project Description: Eighteen month contract for the Digital Data Conversion Services Utility Infrastructure, Phase III, providing improved water services and increased productivity to citizens.